The Repowering Project Day 5

Fort Pierce

This has been another day of good progress. We got the engine out by 10:00. It only took about a half hour of fiddling. The boatyard brought their big fork lift over to do the lifting. It was ideal for the job. We just tied a chain to one of the forks and lifted. It took a little wiggling to make it find its way out. We also had to remove the exhaust header because it was jamming.

That leaves us 2.5 days to clean up the engine compartment, repaint and get ready for Bud Taplin. Things are going according to plan.


I asked the boatyard to order us two gallons of ablative bottom paint. Our existing bottom paint may have a year of life left in it, but while we’re here up on the hard we might as well paint.

Repowering days 6 and 7

Sunday, February 25, 2007

The Repowering Project Day 4

Today we rested. There is nothing more we can do until the marina brings over their fork lift truck tomorrow.


Here's an aerial view of Fort Pierce. Notations on the photo show the marina, our temporary apartmnet, and the outlet to the sea.


Repowering day 5

Saturday, February 24, 2007

The Repowering Project Day 3

Fort Pierce

We made very good progress today. I did all the minor work in the engine removal. I disconnected all the wiring, the fuel, the cooling, and the exhaust.

Then my brother Ed came down from Melbourne to help. Even better, Ed brought his friend Steve. Steve is a mechanic and he has the right tools. Their trip down here was not uneventful. Steve failed to securely close the tailgate on his pickup truck, and some of his tools fell out. When he discovered the loss he was very upset and he retraced his movements for the day attempting to find them. He didn’t succeed. Sorry about that Steve. I know the feeling.

Ed and Steve helped me with the two things I couldn’t do alone with the tools I have. Steve took the nuts off the motor mounts, and he unbolted the shaft coupling. To get the propeller shaft out, we have to remove the propeller and the tiller. The tiller prevented the rudder from moving enough to the side to allow the shaft to be withdrawn. I have a Max Prop, a geared, adjustable and self-feathering propeller. It has internal gears and parts. We disassembled it and accomplished everything except removing the propeller hub from the shaft and the keyway. A gear puller will be required to do that.
On Monday, the boatyard can bring their fork lift and lift out the engine, and they can use a gear puller to pull the propeller hub off and then remove the propeller shaft. Then the engine removal will be complete.

That will leave me two days, Tuesday and Wednesday to clean up and repaint the engine compartment. Bud Taplin will fly the redeye special here and will arrive on Thursday morning. Sounds like a good plan.

As a side activity, I’m going to re-take my exam for the general class ham license on Wednesday night. I took that exam last year on February 11, 2006 but I did not complete the Morse Code test. Despite three months of daily practice and learning with Morse Code, I could never manage to copy reliability with an accuracy better than 80%. It never began to feel natural or become easier to listen to code. Anyhow, I I hoped that they would change the rule to not require the Morse Code. They did change the rule but not until February 23, 2007. My exam was only good for 365 days, so I missed the deadline. Therefore I need to take it again.

Repowering day 4

The Repowering Project Day 2

Riverside Boatyard, Fort Pierce, Florida

Things move slowly down here. We keep telling everybody that we'll be up on the hard for only a few days, maybe a week. They laugh and say, "Call it a month." Our friends Reggie and Terry came here for two weeks, and wound up staying for 5 months of repairs. Captain Bill, who we met today put his boat up for 2 weeks work, and now he's on his second year of repairs. We won't let that happen to us.

Not to say that everything is easy. The boatyard gave me a hassle about outside help. My brother Ed and his friend Steve are coming tomorrow to assist us in removing the old engine. Bud Taplin will come next week and the manager said that he would not be permitted either, despite the fact that he's not being paid. The boatyard said that none of them could assist, or even climb a ladder without insurance. I checked with my insurance company and they were going to send a certificate with language that should satisfy Riverside. Still, the Riverside manager said no.

In the meanwhile I talked with a neighbor, Captain Bill that I mentioned above. Bill said that it was really a matter of money. When local contractors do work in the boatyard, they pay a portion of their fee to the boatyard. Outside helpers who are not paid deprive the boatyard of revenue. With that in mind, I went back with a new ploy. I proposed that the Riverside yard workers would remove the engine and put the new one in, but that I would have the assistance of my friends to prepare for the removal and the supervision of Bud Taplin on the installation. I explained that Bud was an expert that I was calling in because of his expertise. That approach worked, and the manager agreed.

It was a good lesson in diplomacy for me. I would have needed some yard worker help in any case. The difference was in emphasis. In my original mental model I thought to do all the work myself with the help of friends and to call on yard workers in if and when needed. In the compromise model, I asked the boat yard to do the work while allowing me to handle some preparation and supervision with outside resources. The practical difference between the two is not large. What can I say. I'm an engineer. Diplomacy has never been my strong suit.

At the end of the day I rode my bike down to Avis and rented a car. Then we drove out to the barrier island to a place called Bauman Apartments. Bauman was recommended by our friends Reggie and Terry from Blue Topaz. It's very nice. We rented an apartment here for a week, extendable to two weeks. The apartment is delightful. There is even a back yard and a nice dog to play with. Across the street is a path leading to a private beach. Libby was also delighted to find a microwave oven in the kitchen. Wow, such luxury! (Thanks for the recommendation Reggie and Terry)

Anybody want to come visit us in the next week or two? We can host you in better style than we could do onboard Tarwathie.

The only problem is that all this stuff costs money. Ah well, I just have to relax and to consider these expenses as part of the repowering project.

Repowering Day 3

Thursday, February 22, 2007

The Repowering Project Day 1

Fort Pierce 27.49460 -80.332350

By by Vero Beach. Since Sea Tow skunked us on the tow, we were dependent on weather to sail down here. The weather cooperated. We had a nice 5-10 knot breeze from the NW, perfect for our trip. It is also a very nice day. 100% sunshine and 80 degrees (27C). As we slipped the mooring, Libby was so happy to be moving again that she danced a jig on the foredeck.


The engine does run but barely. It gives off black smoke and leaves a trail of oil in the water from the exhaust. We also have to refill the coolant every 15 minutes. However, it starts right away. We reserved the engine for emergencies.


As as second precaution, I put out 30 feet of chain and hung the anchor just above the water. That way if we needed to anchor to prevent a grounding, we could do so instantly. Tarwathie is a big heavy boat, and maneuvering her in tight quarters (like the 40 foot wide channel leading the the haul-out ramp in the marina) in light winds under sail would very risky. Indeed, if we tried that, the probability of colliding with other boats would be more than 50%. Therefore, sick as she is, Tarwathie's engine could serve for precision positioning of the boat.


As it turned out the trip was uneventful. That is except for one minor grounding. It was my fault. I neglected the helm for a second to fiddle with the GPS. In narrow channels, a few seconds neglect is too long. No big deal. We were under way again in about 15 minutes.


We arrived at the Riverside Marina Boat Yard about 13:00. They told us to tie up on some pilings waiting for our haul out. A bit later they told us that they couldn't haul us out until the morning. No big deal. We can wait here.

Repowering day 2